Fir wooden house Cristian c 023

Fir wooden house Cristian c 023

Some of our products

Fir wooden house Cristian c 023

8100 Euro / Kit
  • Availibility: Custom
  • Categories : Garden wooden houses

The fir wooden cottage consists of one room with a surface of 8 sqm, a 3,6 sqm store room and a terrace where you can relax yourself with a book taking advantage of the tranquility of nature. This house is ideal to be located on a small piece of land and it represents the best solution for a family who wants to disconnect from the daily and get in touch with nature. This type of wooden cottages are also suitable to serve as workshops, as they are equipped with a storeroom where the tools can be deposited.

Depending on your needs or desires the project of the house can be modified. The wooden house is going to be made either according to your design either according to a design done together with our team.

You can see the price list of Home Lemn Design if you click here

More details about this product can be found below.

- imprint : 5m / 4m (20 sqm) plus a store room
– Wall thickness - 44 mm - tongue and groove joint technology, beam interlocking at the corners
- room : 4m / 2m (8 sqm)
- storage room : 2m / 1,8m (3,6 sqm)
- front and side terrace 4m / 3m (12 mp)

- exterior walls
- Complete roof of bituminous shingles (for a surcharge can be made of Bilka panel or tiles)
- Classical doors
- Classical windows
- Assembling

- interior walls insulation
- staining of wood
- interior ground floor (between 18 mm – 20 mm, fir wood)
- shutters
- electrical wiring and sanitary group (we don’t carry out electrical or sanitary installation works)
- foundation (we don’t make foundations)
- pedestal
- transportation

1.    The documentation (the project, the plans), the approvals and authorizations are the responsibility of the beneficiary
2.    The foundation (plate), the electric wiring and the piping are provided by the owner
3.    The completion period is between 30 and 90 days starting from the day of the payment of the 40% advance. The next payment of 50% will be made when receiving the KIT (transportation) and the remaining 10% on assembly.
4.    The beneficiary will provide the accommodation and a meal / day for the assembly team.